요청 내용
“Draw an inbound receiving damage process: a shipment arrives, receiving inspects it, undamaged goods go to regular putaway, damaged goods are quarantined and documented, then returnable goods get a return-to-vendor authorization and ship back while other goods are salvaged or written off.”
그렇다면Add a quality hold before putaway.Add a supplier credit after return to vendor.
이 도면에 담긴 내용
그 이면의 의사결정을 읽어 보세요.
01
Damage detected during receiving inspection
02
Return to vendor vs. salvage disposition
Use this flowchart when designing or documenting inbound receiving SOPs that require a clear damage-handling and disposition path.