需求
“Draw an inbound receiving damage process: a shipment arrives, receiving inspects it, undamaged goods go to regular putaway, damaged goods are quarantined and documented, then returnable goods get a return-to-vendor authorization and ship back while other goods are salvaged or written off.”
接著試試Add a quality hold before putaway.Add a supplier credit after return to vendor.
這張圖裡有什麼
看懂背後的決策。
01
Damage detected during receiving inspection
02
Return to vendor vs. salvage disposition
Use this flowchart when designing or documenting inbound receiving SOPs that require a clear damage-handling and disposition path.