Marketing campaign three-point PERT

This three-point PERT chart estimates a marketing campaign from the brief to launch. The brief starts audience research and copywriting. Research informs asset design, while campaign approval waits for both finished copy and assets. Launch follows approval. The optimistic, likely and pessimistic estimates give the team a practical way to discuss uncertainty in creative work and reviews before promising a date. Use the network for campaigns that need a compact dependency view alongside a range of likely durations. Add media booking, localization, legal review or landing-page work where those activities are real launch constraints.

類型 PERT/甘特圖標準 PMI PMBOK 7 + Moder 1983 (AON/PDM)引擎 schematex-pert更新時間 2026/9/24
Marketing campaign PERT estimate
Drawing preview
需求

“Create a three-point PERT estimate for a marketing campaign: set the brief, research the audience, write copy, design assets, approve the campaign, then launch.”

接著試試Add a legal review before approval.Change the likely asset-design duration to six days.
這張圖裡有什麼

看懂背後的決策。

01Brief gate

Research and copy begin after the brief.

02Asset path

Design follows audience research.

03Approval gate

Approval needs copy and assets.

Use for a campaign with uncertain creative lead times.

瀏覽所有 PERT/甘特圖 範本 →

常見問題

常見問題

What can run in parallel?

Research and copywriting begin after the brief.

Why estimate approval?

Review duration can vary.

What starts the launch?

Approved copy and assets.