ChatDiagram
1 template · Matrix

Risk Matrix Templates and Examples

A risk matrix plots every identified risk on a grid where one axis is likelihood and the other is impact — giving you an instant visual of which risks need urgent action and which can be monitored.

Standard 2×2 / N×M quadrant conventionEngine schematex-matrixExport SVG · PNG · PDF
How to

How to use a matrix template.

  1. 01List your identified risks

    Provide a list of risk items — e.g. 'vendor delay, data breach, scope creep, key-person departure.' ChatDiagram places each on the matrix.

  2. 02Rate likelihood and impact

    Assign each risk a likelihood (1–5) and impact (1–5) score. If you skip this step, ChatDiagram estimates from context clues in your description.

  3. 03Review the generated heat map

    Risks appear as labeled cells color-coded from green to red. High-scoring risks in the upper-right corner demand immediate attention.

  4. 04Add mitigation notes

    Ask ChatDiagram to annotate each high-risk cell with a suggested mitigation or owner — turns the matrix into an actionable register.

  5. 05Export for your risk report

    Download as PNG or SVG and paste into your project charter, safety report, or board presentation.

FAQ

Questions about matrix templates

What is a risk matrix?

A risk matrix (also called a risk heat map) is a two-dimensional grid that plots the likelihood of a risk occurring on one axis and the severity of its impact on the other. The intersection gives a risk score used to prioritize responses.

What does a 5×5 risk matrix mean?

A 5×5 matrix uses a 1–5 scale for both likelihood and impact, creating 25 cells. Risk scores range from 1 (low × low) to 25 (high × high). Scores above a threshold (often 12–15) are flagged as high risk.

How is a risk matrix different from a risk register?

A risk register is a detailed table listing risks, owners, dates, and mitigation plans. A risk matrix is the visual summary — it shows the distribution of risks at a glance and communicates priorities to stakeholders.

Can I use this for health and safety risk assessments?

Yes. The 5×5 likelihood × severity format is widely used in occupational health and safety (OH&S) assessments and aligns with ISO 31000 risk management guidelines.

What colors should I use for risk zones?

Green for low risk (scores 1–4), yellow/amber for medium (5–12), and red for high (13–25) is the most common convention. Some organizations add an orange zone for very high (20–25) distinct from critical (25).