ChatDiagram
project planning · construction

House build critical path

This critical path diagram organizes a house build from excavation through inspection. Foundation and framing form the main structural sequence. After framing, roofing and service rough-in proceed in parallel and both must finish before final inspection. The network makes the handoff points clear and gives a manager a compact starting point for discussing durations and constraints. Add permitting, procurement, finishes and trade inspections when they affect the actual project. Review the critical sequence whenever a duration or predecessor relationship changes.

種類 PERT / ガントチャート規格 PMI PMBOK 7 + Moder 1983 (AON/PDM)エンジン schematex-pert更新日 2026/9/24
House build critical path
Drawing preview
依頼内容

“Create a critical path diagram for a house build: excavate, pour the foundation, frame the house, install the roof, rough in services, then complete final inspection.”

次はこちらAdd a two-day permit check before excavation.Change framing to take ten days.
この図に含まれるもの

図の背後にある意思決定を読み解く。

01Foundation gate

Framing starts after the foundation.

02Parallel work

Roofing and services follow framing.

03Finish gate

Inspection waits for both paths.

Use for a compact construction schedule.

PERT / ガントチャートのテンプレートをすべて見る →

よくある質問

よくある質問

What is critical?

The longest dependent sequence controls completion.

Can roofing overlap services?

Yes, both follow framing.

Why is inspection last?

It requires both work paths.