Work breakdown structure examples.
Same tool, four requests. Every drawing below is a real render.
Rather start from a finished drawing? Browse 111 org chart templates →
What a work breakdown structure is.
A work breakdown structure, or WBS, divides a project into deliverables and smaller pieces of work. The top level is the whole project; lower levels show phases, work packages and the scope that belongs in each one.
A WBS defines what must be delivered, rather than when it happens. Use it before building a schedule, assigning owners or estimating cost, so the project team has the same view of the work.
- Standard
- Reingold-Tilford tidy tree
- Engine
- schematex-orgchart
- Editable
- Double-click text, drag nodes
- Export
- SVG · PNG · PDF
Who uses work breakdown structures.
A complete scope hierarchy to turn into a schedule, budget and ownership plan.
Launch work grouped into positioning, readiness, campaign and review.
Venue, program, attendee and delivery work on one page.
How to make a work breakdown structure in three steps.
Describe it
One paragraph is enough to start.
See the drawing
Drawn by the right engine.
Say what changes
Every edit keeps a version.
Common questions
What is a work breakdown structure?
A WBS is a hierarchical decomposition of a project into deliverables and manageable work packages.
How is a WBS different from a project schedule?
A WBS describes the scope of work. A schedule adds dates, dependencies and duration.
How detailed should a WBS be?
Go deep enough that the lowest work packages can be estimated, assigned and tracked without becoming a task list.
Who creates a WBS?
The project manager usually leads it with the people responsible for the project’s scope.